Saturday 5 July 2008

raking cut.


This is the raking cuts i did for the lead to hang over the chimney.

Friday 4 July 2008



This is a driveway into the showhouse i helped to lay with block pavings.


This is the finished curved wall of a garden with brick on edge.

This is a boundery wall i completed for the entrance of the site.

Friday 2 May 2008

curved wall 4

This is the 9 inch garden wall i completed with my employer for a garden with a brick on edge .

garden wall panel.

This is a panel i completed myself for a garden wall i worked to the expansion joint.

Curved wall

This is a garden wall i completed with my employer using headers to form the curve.

Main garden wall.

This is a main 9 inch garden wall with cock on end on top i completed with my employer we used trestles to reach the last 10 courses.


curve brick on edge


This a brick on edge on a curve i helped out and jointed with my employer.

Saturday 19 April 2008



This is my examination wall i passed in college this is called the phase test.

Sunday 23 March 2008

House cageing .


This is cageing i fitted for a house concrete will be poured onto this to form the slab for the house.

Window opening.

This is a window opening i built.

Garden wall 3.


This again is a garden wall behind a house with weep holes and brick on edge.

Garden walls.


This is another garden wall i builtwith brick on edge on top.

Door opening.


This is a door opening i built.

Pillors


These are pillors i built for a garden wall.

Shuttering


This is shuttering i built for a garage .

Window opening


This is a window opening i built.

Sunday 24 February 2008


These are garden walls i built with pillors .

Saturday 26 January 2008



This is one side of a 215 mm wall me and my dad built .


This is me filling in the expansion joint with foam.


This is me brushing a facework wall i started

This is a pillor i built for the opening of the site.

Sunday 13 January 2008


This is drainage i fitted for a futre manhole.


This is brickwork i built up against a retaining wall .

Saturday 12 January 2008



This is brickwork i built around a house at damp proof level.


This is a manhole i built for sewage .


This is shuttering i built around a sespit tank.


This is a corner i was building up to first lift .


This is a boundery wall going around a garage .


This is a chimney i was building up to first lift .


This is a chimney i was building up to first lift .


This is a boundery wall i built with a pillor coming off it.